Octavia II 2004 ➤ , Octavia II 2010 ➤
Electrical system - Edition 12.2013
– Press off the catch pegs -arrows- and press the plug connec‐
tions out of the relay carrier.
Installing
Installation is carried out in the reverse order. When installing,
observe the following:
– Follow the work procedure when connecting the battery
⇒ page 2
.
1.3
Removing and installing additional relay
carrier above the onboard supply control
unit
Note
The assignment of the relay carrier depends upon the vehicle
♦
equipment.
Exact assignment of the relay carrier ⇒ Current flow diagrams,
♦
Electrical fault finding and Fitting locations.
Removing
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not permitted
unless authorised by ŠKODA AUTO A. S. ŠKODA AUTO A. S. does not guarantee or accept any liability
– Disconnect battery earth strap
with respect to the correctness of information in this document. Copyright by ŠKODA AUTO A. S.�
– Remove lower part of the dash panel insert on the driver's side
⇒ Body; Rep. gr. 70 Work.
– Pull the relay out of the relay carrier above the vehicle voltage
control unit.
– Slacken the plug connections -1- out of the catch pegs
-arrows- and press out of the relay carrier.
– Release the holder -arrow A- and remove together with the
fuse -arrow B- from the relay carrier.
180
Rep. gr.97 - Wiring
⇒ page 2
.