ENGINE / COOLING SYSTEM
HEAD PIPE / TURBO REMOVAL
1. Remove the exhaust pipe. See Exhaust Pipe
Removal page 3.16 outlined in this chapter.
2. Remove two P-clip fasteners retaining the oil feed line
to the turbo bracket assembly.
q
3. Remove two hoses
boost control valve. Mark hoses for correct
reinstallation to the boost control valve.
4. Remove the banjo bolt
and remove the oil drain hose
Use caution when removing oil feed line to avoid
bending/damaging the hard line.
IMPORTANT
The oil line sealing washers MUST be replaced any
time the oil line/fitting is removed. Use only the
recommended washers shown in the Polaris Electronic
Parts Catalog.
3.18
from the turbo going to the
w
retaining the oil inlet hose
e
.
CAUTION
5. Remove two fasteners
t
inlet hose
and outlet hose
6. Remove two fasteners
the turbo.
7. Loosen four fasteners
bracket and pivot the top of the turbo bracket forward.
8. Remove two fasteners
heat shield.
9850068 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
r
and remove the coolant
y
.
u
retaining turbo bracket to
i
on the engine mounting
o
and remove the lower turbo
© Copyright Polaris Industries Inc.