Polaris RZR PRO XP 2020 Service Manual page 192

Hide thumbs Also See for RZR PRO XP 2020:
Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
24. Disconnect the fuel line
h
25. Disconnect vent line
26. Loosen and remove clamps
manifold to engine. Remove lower manifold mounting
k
bolt
(to trans mount bracket).
27. Remove intake manifold and throttle body as
assembly.
28. Disconnect the starter wiring.
3.48
g
at the fuel rail.
from the valve cover.
j
retaining intake
29. Remove PVT hoses and outer cover.
30. Remove secondary clutch, belt, and primary clutch.
31. Remove six fasteners
cover baffle.
32. Support the bottom side of the engine with wood
blocks or from the top side with an engine lift.
33. Remove the three allen screws
retaining inner cover to engine.
9850068 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
l
and remove the inner PVT
1(
and washers
© Copyright Polaris Industries Inc.
2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr pro xp 2021Rzr pro xp 4 2020Rzr pro xp 4 2021

Table of Contents