Removing The Top Cover Of The Mass Spectrometer; Figure 67. Front Door Latch - Thermo Scientific LTQ Series Hardware Manual

Table of Contents

Advertisement

Removing the Top Cover of the Mass Spectrometer

Thermo Scientific
IMPORTANT
• Prepare a clean work surface by covering the area with lint-free paper.
• Put on a new pair of lint- and powder-free gloves before starting each of these
removal, cleaning, and reinstallation procedures.
CAUTION HOT SURFACE At operating temperatures above 350 °C (662 °F), the probe
and API source housing can severely burn you.
• Before removing the probe or API source housing, allow the part to cool to room
temperature (approximately 20 minutes) before touching it.
• If the mass spectrometer connects to an LC system, leave the solvent flow from the
LC pump on while the probe cools to room temperature.
To remove the top cover of the mass spectrometer
CAUTION To avoid an electrical shock, be sure to follow the instructions in
Down the Mass Spectrometer Completely"
procedure.
1. Shut down and vent the system, and let it cool to room temperature.
Venting the mass spectrometer can take several minutes.
2. Unplug the mass spectrometer's power supply cord from the electrical outlet.
3. Disconnect any tubing between the syringe pump or LC system and the API source.
4. Use the 1/4 in. hex driver to loosen the latch on the front door

Figure 67. Front door latch

MP0 and MP1 Ion Guides Maintenance
on
page 36
before continuing with this
(Figure
Door latch
LTQ Series Hardware Manual
5
Maintenance
"Shutting
67).
99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents