4. Part Replacement
User Guide
4.8 Rails Replacement
Figure 128: Connected Cable Routing
d. Wrap cable tie around the installed cable bundle between the ports and the first basket
of the CMA
Note: Each cable must be given enough slack at the connector end to
operate smoothly. For the upper CMA allow 20" - 21" (508 – 533.4mm)
between the end of the connector and the first basket. Make sure to
route all of the upper CMA cables under the lower CMA cables.
120
Need help?
Do you have a question about the Ultrastar Data60 and is the answer not in the manual?