11.2 Reference Information for Servomotor Capacity Selection
11.2.4 Application Examples by Type of Application
Machine Configuration
Load Speed, N (min
Speed Calculated at
Motor Shaft, N
Linear
Motion
Section,
GD
2
2
(kgm
Load
Torque
(kgm)
Load Moving Power, P
(kW)
Load Acceleration
Power
Starting Torque, T
(kgm)
Deceleration Torque, T
(kgm)
Effective Torque Value,
Trms (kgm)
System Remarks
11-8
Applied pressure, N (kg)
Tension, F
-1
)
[However,
-1
(min
)
M
2
GD
Cal-
culated at
Load Shaft
2
GD
Cal-
L
culated at
)
Motor
Shaft
T Calcu-
lated at
Load Shaft
T
Calcu-
L
lated at
Motor
Shaft
O
T
P
P
S
t
a
• Feeding of coiled and sheet materials
• Roller slipping affects accuracy.
• A measuring roller pulse generator
may also be installed separately.
Roll Feeder
Bearing friction
μ2
coefficient
(kg)
W(kg)
1
μ1
φ
dp(mm)
1/R
Load speed (m/min)
1000 ×
V
P
B
P
=π
d
]
P
B
R × N
d
2
(
)
W
P
1000
1
2
( )
×
2
GD
L
R
V
2
(
)
W
OR
π
N
M
d
P
(
F
+μ
W
+μ
N
)
2000
1
1
2
Mechanical
1
1
T ×
×
η
R
efficiency
(
F
+μ
W
+μ
N
) V
1
1
2
OR
η
2π
N
M
+ μ
(
F
+μ
)
V
W
N
1
1
2
6120 × η
2
2
GD
N
365 × 10
×
3
t
a
Acceleration time (s)
T
V (m/min)
T
T
L
t
t
c
d
T
Continued from previous page.
Rack and Pinion
F
(kg)
V
W(kg)
μ
1/R
Load speed (m/min)
1000 ×
V
P
B
= π
However,
P
d
B
OR
P
=
Z
B
P
R × N
(
W
1000
( )
×
2
GD
L
(
OR
W
{μ (W+
F
)+
V
1
1
T ×
×
η
R
{μ (W+
OR
2π
{μ (
W F
+
V
6120 × η
2
2
GD
N
365 × 10
×
3
t
Acceleration time (s)
GD
2
GD
2
N
(
+
)
M
L
M
=
+
T
375
t
P
L
a
2
2
(
GD
+
GD
)
N
M
L
M
=
-
T
t
375
S
L
d
2
+
2
+ T
2
T
t
T
t
t
P
a
L
c
S
d
T
=
rms
T
When a load torque is applied while stopped for a vertical ball screw:
T
2
t
+
T
2
(
T
- -
t
t
P
a
L
a
d
T
=
rms
T
• Can be used for positioning with long
travel distances.
• A separate pulse generator is often
installed.
Continued on next page.
F
(kg)
H
φ
dp(mm)
Number of teeth, Z
P
Pitch, L
(mm)
P
P
L
P
d
2
)
P
2
1
R
V
2
)
π
N
M
d
P
F
}
H
2000
Mechanical
efficiency
F
F
V
)+
}
V
H
η
N
M
)+
F
} V
H
a
)+
T
2
t
S
d