Sony FVS-1000 System Maintenance Manual page 60

Multi resolution film scanner, multi resolution telecine, telecine processor, telecine hdtv/sdtv processing boards, telecine log data processor, telecine 16 mm film adaptor kit, telecine optical kit, telecine mounted slide kit, telecine film sound process
Hide thumbs Also See for FVS-1000 System:
Table of Contents

Advertisement

1-11. Installation of Optional Units
(2) Connect terminal board 3 of the right switch and terminal board 4 of the left switch to the sub harness
(IS2-IS2).
(3) Connect the red harness of the sub harness (IS2-ILG) to terminal board 4 of the right switch, and the
white harness to terminal board 3 of the left switch, and install the inter lock switch to the top panel
of the FVS-1000 System using the four screws.
Inter lock switch
(LEFT)
Inter lock switch
(RIGHT)
Terminal board 4
Terminal board 3
Terminal board 4
Red harness (IS2-ILG)
(4) Draw the sub harness (IS2-ILG) as shown in the figure, connect the sub harness (IL-M-PRE), and
install the inter lock switch cover.
Harness (IS2-ILG)
1-48
Terminal board 3
White harness (IS2-ILG)
Harness (IS2-IS2)
Inter lock switch
(LEFT)
Inter lock switch
(RIGHT)
Harness (IS2-ILG)
Harness (IL-M-PRE)
Harness (IS2-ILG)
Harness (IS2-IS2)
Inter lock switches
FVS-1000 MMP1

Advertisement

Table of Contents
loading

Table of Contents