Upgrading Configuration From Eight To 16 2.5-Inch Hdds/Ssds - Fujitsu PRIMERGY RX4770 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Concluding steps
▶ Insert all HDD/SSD modules, see
on page
142.
Make sure that you reinstall the HDD/SSD module in the bay it was
located before the HDD backplane replacement.
▶ If applicable, install the ODD, see
"Installing the fan cage" on page
"Installing the air duct 1 (top system board)" on page
"Reassembling" on page
"Connecting the power cord" on page
"Switching on the server" on page
▶ If
applicable,"Installing the front cover with lock" on page
7.4.7
Upgrading configuration from eight to 16 2.5-inch
HDDs/SSDs
Upgrade and Repair Unit
(URU)
Tools:
Phillips PH2 / (+) No. 2 screw driver
CAUTION
All data on all HDDs/SSDs in the array will be lost when deleting the
RAID array!
Be sure to back up your data before deleting a RAID array.
For more information, see the "ServerView Suite RAID
Management" user guide.
Preliminary steps
▶ If
applicable,"Removing the front cover with lock" on page
"Shutting down the server" on page
RX4770 M6
Hard disk drive (HDD) / solid state disk (SSD)
"Installing 2.5-inch HDD/SSD modules"
"Installing the ODD" on page
66.
53.
59.
60.
46.
Upgrade and Maintenance Manual
303.
71.
61.
Hardware: 10 minutes
45.
159

Advertisement

Table of Contents
loading

Table of Contents