Fujitsu PRIMERGY RX4770 M6 Upgrade And Maintenance Manual page 322

Table of Contents

Advertisement

Front panel
Figure 199: Installing the COP (C)
▶ Insert the front panel cable in the connector (1).
▶ Press down the locking bar (2).
Concluding steps
"Installing the air duct 2 (bottom system board)" on page
"Installing the top system board carrier" on page
"Installing the air duct 1 (top system board)" on page
▶ Install the riser module for PCIe slot 10 and PCIe slot 11, see
riser module" on page
"Installing the fan cage" on page
"Reassembling" on page
"Connecting the power cord" on page
"Switching on the server" on page
▶ If applicable,
"Installing the front cover with lock" on page
"Using the Chassis ID Prom Tool" on page
"Verifying system information backup or restore" on page
"Resuming BitLocker functionality" on page
322
63.
66.
53.
59.
60.
Upgrade and Maintenance Manual
72.
76.
71.
61.
110.
88.
104.
"Installing a
RX4770 M6

Advertisement

Table of Contents
loading

Table of Contents