Figure 6-68: Route Clutch Motor Cables Beneath Front Of Table - GE Discovery LS System Service Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
2307224-100, R
IRECTION
EVISION
a.) Attach Base Potentiometer E, P/N 2323729, to J1 of the bulkhead. (Refer to
b.) Attach Clutch Control E, P/N 2323726, to J2 of the bulkhead.
c.) Attach Base Axis Motor E, P/N 23237720, to J3 of the bulkhead.
3.) Locate and remove Ground Cable, P/N 2340388, from the kit.
4.) Refer to
following hardware from the kit:
46-312577P27
2236649
46-328432P8
46-328425P11
1. Refer to
base rail, then route them under the front of the table to make the connections to the original
motor clutch cables in the gantry. (See
instructions.)
Page 160
6
Cable P/N 2323729 has a pigtail permanently attached to the gantry end of the cable.)
Figure
6-67. Attach the J3 ground and P/N 23237720 to the bulkhead with the
Part Number
M5 x 20 mm Socket-Head Cap Screw
M5 Flat Washer
M5 Lock Washer
M5 Hex Nut
Figure
6-68. Tie-wrap the cables and ground wire into place along the secondary
Tie-wrap cables along side rail.
Cables routed beneath front of table.

Figure 6-68: Route Clutch Motor Cables Beneath Front of Table

Chapter 6 - Table
D
ISCOVERY
Description
page 123
for the clutch motor cable removal
LS S
S
M
YSTEM
ERVICE
ANUAL
Figure
6-69.
Quantity
1
2
1
1

Advertisement

Table of Contents
loading

Table of Contents