3.) If the 3 mm clearance cannot be obtained between the bottom of the Table latch and the
CT-PET Position Latch Arm, reposition the solenoid.
a.) Refer to
b.) Slide the solenoid all the way toward the front of the table, until it clears the bottom of the
c.) Using a 2.5 mm Allen wrench, tighten the solenoid hardware.
4.) Check the latch clearances in the Solenoid Energized position.
a.) Refer to
b.) Slide the table forward and check the clearance.
c.) Use a 1.5 mm Allen wrench to ensure the edge of the latch arm now clears the Table Latch
6
Figure
6-103. Use a 2.5 mm Allen wrench to loosen two solenoid screws.
service latch by 3 to 3.5 mm.

Figure 6-103: Reposition the Solenoid

Figure
6-104. Manually depress the solenoid latch arm.
Bar by 1.5 mm.
Leading edge of solenoid latch arm detent should clear service latch by 1.5 mm.

Figure 6-104: Check Latch Clearance in "Energized" Position

Chapter 6 - Table
D
LS S
S
ISCOVERY
YSTEM
ERVICE
Adjust Solenoid Latch
with Table Latch Pin in
place.
Adjust for 3 to 3.5 mm
clearance.
Solenoid Screws