System Calibration Quick Guide - GE Discovery LS System Service Manual

Table of Contents

Advertisement

GE
HEALTHCARE
D
2307224-100, R
IRECTION
EVISION
Appendix B - System Calibration Quick Guide
The table below contains a list of the calibration procedures necessary for the regular operation of
the Discovery LS PET-CT system. The PET calibration procedures are described in the PET
Advance Operator Manual, Direction 2280383-100. The calibrations should be performed in the
order presented in the table.
No.
1
2
3
4
5
6
7
8
9
10
11
12
Note:
Well Counter Correction should be performed after running the VQC procedure.
6
Calibration Type
Reboot
Daily
Singles:
Weekly
Update Gain
• When performing position
(crystal map calibration).
• After detector or ACEM board
replacement.
Singles:
• Every 3 months.
Position
• After detector replacement.
Singles:
• Every 3 months.
Energy
• When performing position
(crystal map calibration).
CTC
Weekly
Blank Scan
Daily
Normalization
Every 3 months
VQC
Weekly during 4-8 weeks after initial
installation, then monthly.
Well Counter
Every 3 months.
Calibration
Tube Warm-Up
Daily
Fast Cals
Daily
(Once every 3 months, a full
System call must be performed by a
Service Engineer.)
Clean Database
Weekly
Appendix B - System Calibration Quick Guide
D
Frequency
5 min.
50 - 240 min.
50 min.
50 min.
10 - 15 min.
30 min.
12, 18, or 24 hours
depending on
sources strength.
15 min.
1 - 2 hours
1 min.
30 min.
20 min.
LS S
S
M
ISCOVERY
YSTEM
ERVICE
Duration
Page 347
ANUAL

Advertisement

Table of Contents
loading

Table of Contents