10.11 Acceptance test and acceptance report

10.11
Acceptance test and acceptance report
Note
Acceptance test support in STARTER
After commissioning the Safety Integrated functions, you can use STARTER to create an
acceptance report template containing the parameters to be documented (see STARTER >
"Drive unit" > "Documentation").
Purpose
Note
Responsibilities
The machine manufacturer is responsible for carrying out and documenting the acceptance
test: In Chapter "Acceptance tests (Page 724)" you will find examples how the acceptance
test is carried out and documented for the individual safety functions.
10.11.1

Acceptance test structure

Authorized person, acceptance report
The test of each SI function must be carried out by an authorized person and logged in the
acceptance report. The report must be signed by the person who carried out the acceptance
test. Access rights to SI parameters must be protected by a password. This procedure must
be documented in the acceptance report - the password itself must not appear there.
Authorized in this sense refers to a person who has the necessary technical training and
knowledge of the safety functions and is authorized by the machine manufacturer to carry
out the acceptance test.
Note
Further information
• Note the information in Section "Commissioning the "STO", "SBC" and "SS1" functions
(Page 709)".
• The acceptance report presented below is both an example and recommendation.
• An acceptance report template in electronic format is available at your local Siemens
sales office.