Electrical installation
4.6 Connections
4.6.12.3
Cable routing for Basic Line Modules
For the Basic Line Modules, the customer must carry out the following cabling or connection
work:
Table 4- 15
Cable routing
PROFIBUS cable or PROFINET cable to the Control Unit
DRIVE-CLiQ connections / signal cables to the Control Unit
Signal cables to the customer terminal block –X55
Notice:
The "Basic rules for cable routing" and "Preparatory steps" described above must
be observed whenever any cabling or connection work is performed!
112
Checklist for cabling or connection work for Basic Line Modules
Completed?
Cabinet Modules
Manual, 03/2013, A5E03263538A
Need help?
Do you have a question about the SINAMICS S120 and is the answer not in the manual?