Siemens SINAMICS S120 Manual page 112

Cabinet modules
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical installation
4.6 Connections
Cable routing for connecting to the supply infeed
1. Feed the infeed cable into the cabinet from the bottom.
2. Connect the PE cable to the grounding bar.
3. Feed the cable up through the cabinet to terminal block -X1.
4. Secure the cable at suitable points.
5. Connect the cable to the terminal block.
110
FL
GL/HL
Frame size:
JL
KL/LL
Cabinet Modules
Manual, 03/2013, A5E03263538A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents