Securing The Robot Unit - Denso VS-G Series Installation & Maintenance Manual

Vertical articulated
Table of Contents

Advertisement

1.2.3

Securing the Robot Unit

(1) Drill four bolt holes (M10) 20-mm deep or more, and two dowel pin holes (φ4, H7 for
(2) Drive the diamond-shaped pin into the φ4H7 hole so that it orients as shown below.
(3) Drive the internally threaded positioning pin into the φ6H7 hole.
NOTE: Be sure to drive the knock pins. It can minimize positional deviations that may
be caused by the removal/installation of the robot unit for maintenance or the vibration
during operation.
(4) Set the robot unit into place on the robot mount.
(5) Secure the robot unit to the mount with four bolts and plain washers.
diamond shaped pin, and φ6H7 for internally threaded positioning pin) 10-mm deep
or more in the robot mounting position where the robot unit is to be secured,
according to the dimension in the figure below.
When transporting the robot unit, follow the instructions given in Section 1.2.2
"Transporting the Robot Unit."
⋅ Bolt: M10 × 30 mm (strength class: 12.9)
⋅ Tightening torque: 70 ±14 Nm
Bolt Positions for Securing the Robot Unit (VS-G series)
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vs-6556gVs-6577g

Table of Contents