2.6 First commissioning control mode vector U/f in booksize format

2.6
First commissioning control mode vector U/f in booksize format
An example provided in this chapter explains all the configuration and parameter settings, as
well as tests that are required for initial commissioning. Commissioning is carried out using
the STARTER commissioning tool.
Preconditions for commissioning
1. The commissioning preconditions (Page 15) have been met.
2. The commissioning checklists (Page 17) (Tables 1-1 and 1-2) have been completed and
3. The STARTER commissioning tool is installed and activated.
4. The drive system has been wired according to the specifications.
5. The communication between the PG/PC and drive system has been prepared.
6. The power supply of the Control Unit (24 V DC) has been switched on.
2.6.1

Task

A drive in the "booksize" format with "Vector U/f" control mode with the following components
is to be commissioned for the first time:
Table 2- 10
Designation
Closed-loop control and infeed
Control Unit
Smart Line Module
Line filter package 16 kW
Drive 1
Motor Module
Motor
Drive 2
Motor Module
Motor
The enable signals for the infeed and the drive should be realized via terminals.
106
the points fulfilled.
– see the "Readme" file on the STARTER installation DVD
Component overview
Component
Control Unit 320-2 DP
Smart Line Module 16 kW
Line filter and line reactor
Single Motor Module 9 A
Induction motor
Single Motor Module 9 A
Induction motor
Commissioning Manual, (IH1), 01/2012, 6SL3097-4AF00-0BP2
Order number
6SL3040-1MA00-0AA1
6SL3130-6TE21-6Axx
6SL3100-0BE21-6AB0
6SL3120-1TE21-0Axx
1PH8083-1xF2x-xxxx
6SL3120-1TE21-0Axx
1PH8083-1xF2x-xxxx
Commissioning Manual

Advertisement

Table of Contents
loading

Table of Contents