Preface
Note
SINAMICS S units fulfill EMC Directive 2004/108/EC in the configuration specified in the
associated EC Declaration of Conformity for EMC and when the EMC installation guideline
provided in the Configuration Manual with Order No. 6FC5297-0AD30-0⃞P⃞ is
implemented.
Note
The Commissioning Manual describes a desired state, which, if maintained, ensures the
required level of operational reliability and compliance with EMC limit values.
Should there be any deviation from the requirements in the Commissioning Manual,
appropriate actions (e.g. measurements) must be taken to check/prove that the required
level of operational reliability and compliance with EMC limit values are ensured.
EMC limit values in South Korea
The EMC limit values to be complied with for South Korea correspond to the limit values of
the EMC product standard for variable-speed electric drives EN 61800-3, Category C2 or
limit value class A, Group 1 according to EN 55011. By applying suitable supplementary
measures, the limit values according to Category C2 or according to limit value class A,
Group 1, are maintained. Further, additional measures may be required, for instance, using
an additional radio interference suppression filter (EMC filter).
The measures for EMC-compliant design of the system are described in detail in this manual
respectively in the Installation Guideline EMC.
Please note that the final statement on compliance with the standard is given by the
respective label attached to the individual unit.
Spare parts
Spare parts are available on the Internet at:
http://support.automation.siemens.com/WW/view/en/16612315
Test certificates
The Safety Integrated functions of SINAMICS components are generally certified by
independent institutes. An up-to-date list of already certified components is available on
request from your local Siemens office. If you have any questions relating to certifications
that have not been completed, please ask your Siemens contact.
6
Commissioning Manual, (IH1), 01/2012, 6SL3097-4AF00-0BP2