GE 469 Instruction Manual page 233

Motor management relay
Hide thumbs Also See for 469:
Table of Contents

Advertisement

469
Overview
Motor Management Relay
7 Testing
Overview
Test Setup
The purpose of this testing description is to demonstrate the procedures necessary
to perform a complete functional test of all the 469 hardware while also testing
firmware/hardware interaction in the process. Since the 469 is packaged in a
drawout case, a demo case (metal carry case in which an 469 may be mounted)
may be useful for creating a portable test set. Testing of the relay during
commissioning using a primary injection test set will ensure that CTs and wiring are
correct and complete.
GE Multilin
7–1
http://www.GEindustrial.com/multilin