Mitsubishi Electric MELDAS C6 Interface Manual page 242

Cnc
Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

B con-
Signal name
tact
TOOL LENGTH
MEASUREMENT
[Function]
"Tool length measurement 1" is selected by this signal.
[Operation]
When the signal (TLM) is turned ON (1), amount of tool length to be corrected is calculated
automatically in the controller.
[Caution]
(1) This signal is invalid if the tool length data screen is not selected.
(2) The calculation result is read when entry key is pressed.
B con-
Signal name
tact
TOOL LENGTH
MEASUREMENT 2 (L ONLY)
[Function]
"Tool length measurement 2" is selected by this signal.
[Operation]
When the signal (TLMS) is turned ON, tool length measurement mode is established. When skip
signal is input during tool length measurement, amount of tool length to be corrected is calculated.
[Cautions]
(1) To use the tool length measurement 2 function, select manual operation mode.
Otherwise, tool length measurement mode cannot be established.
(2) Tool length measurement 2 can be used with a machine equipped with tool measurement
sensor.
The sensor for tool length measurement is connected to the connector "SENSOR" No. 2 pin on
the controller unit.
(3) The calculation result is read automatically inside the controller.
[Related signals]
R4720 ... Tool No. of tool to be measured is specified (T 4-digit BCD).
[Timing chart]
Manual mode
Tool length measurement 2
(TLMS)
Manual feed
Tool measurement sensor
6. EXPLANATION OF INTERFACE SIGNALS
6.3 PLC Output Signals (Bit Type: Y***)
Signal
abbreviation
TLM
Signal
abbreviation
TLMS
Measurement mode
6-3-45
1st system
2nd system
Y720
Y800
1st system
2nd system
Y721
Y801
Controller internal interlock
3rd system
Y8E0
3rd system
Y8E1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas c64Meldas c64t

Table of Contents