Mitsubishi Electric MELDAS C6 Interface Manual page 207

Cnc
Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

B con-
Signal name
tact
SPINDLE PHASE
SYNCHRONOUS CONTROL
[Function]
Spindle phase synchronization starts this signal is turned ON during the spindle synchronous
control mode.
[Operation]
Spindle phase synchronization starts when the "Spindle phase synchronous control" signal
(SPPHS) is input during the spindle synchronous control mode. The "Spindle phase
synchronization complete" signal is output when the spindle phase synchronization attainment level
setting value (#3051 spplv) is reached.
(Note 1) This signal will be ignored even if it is turned ON during a mode other than the spindle
synchronous control mode.
Spindle synchronous
control (Y432)
In spindle synchronous
control (X42A)
Spindle rotation speed
synchronization complete (X42B)
Spindle phase synchronous
control (Y433)
Spindle phase synchronization
complete (X42C)
(Note 2) This is turned OFF once to change the rotation speed during phase synchronization.
[Related signals]
In spindle synchronous control (SPSYN1: X42A)
Spindle rotation speed synchronization complete (FSPRV: X42B)
Spindle synchronous control (SPSYC: Y432)
Spindle synchronous rotation direction (SPSDR: Y434)
Spindle phase synchronization complete (FSPPH: X42C)
Spindle synchronization phase shift amount (R159)
6. EXPLANATION OF INTERFACE SIGNALS
6.3 PLC Output Signals (Bit Type: Y***)
Signal
abbreviation
SPPHS
Spindle phase synchronous
control ON
Spindle rotation speed
synchronization complete ON
In spindle synchronous control ON
6-3-10
1st system
2nd system
Y433
(Note1)
Spindle phase synchronization
complete ON
3rd system
Spindle phase
synchronous
control OFF
Spindle synchronous control (Y432) OFF
In spindle synchronous control (X42A) OFF

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas c64Meldas c64t

Table of Contents