13.3
Supervised / Non-supervised
A voltage output is normally supervised (default). By unmarking the "Supervised" checkbox
the voltage output will be non-supervised.
A normally high output cannot be supervised.
13.4
Output signal period
Each output uses an "Output signal period", which controls the output's activation. The
following are available:
User defined 1-8 can be configured with type and time.
Types:
1. Steady (continuous)
2. Intermittent
3. Pulse
4. Steady, Delayed Activation
5. Intermittent, Delayed Activation
6. Pulse, Delayed Activation
7. Steady, Delayed De-Activation
Times:
Delay time (when required)
Pulse length time (when required)
Pulse off time (when required)
De-activation time (when required)
See also Figure 31 below
Regarding the programming, see chapter "Output Signal Periods", page 156.
Figure 30 EBLWin output signal period dialog box.
84
Technical/Programming Manual
FT1020G3 Rev 2.2.1