Cisco 350 Series Administration Manual page 161

Managed switches
Hide thumbs Also See for 350 Series:
Table of Contents

Advertisement

8
STEP 3
STEP 4
135
this in the following. Click on a (black) network ports that you want to select as a stacking
port. The network port then becomes yellow to indicate that it will be a stacking port. (If
you click on a yellow stacking port, it becomes a network port (black)).
To configure unit ID after reset for devices in the stack, click the device in the Stack Topology
View, and enter the following field:
Unit ID After Reset—Select a unit ID or select Auto to have the unit ID be assigned
by the system.
Unit x Stack Connection Speed—Displays the speed of the stack connection.
Click Apply and Reboot. The parameters are copied to the Running Configuration file and
the stack is rebooted.
Cisco 350, 350X and 550X Series Managed Switches, Firmware Release 2.4, ver 0.4
Administration: Stack Management
Stack Management

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents