Cisco 350 Series Administration Manual page 753

Managed switches
Hide thumbs Also See for 350 Series:
Table of Contents

Advertisement

Smart Network Application (SNA)
Services
STEP 1
STEP 2
Cisco 350, 350X and 550X Series Managed Switches, Firmware Release 2.4, ver 0.4
Editable Parameters
You can create a power schedule (see
apply it to the devices. To perform this action, select the start time and end time of activity for
every day of the week and then select one of the following behaviors for off times.
PoE power inactive
Data inactive
PoE power and data inactive (default)
To properly activate the schedule on the devices, at least one port must be selected in each
device.
You can only select a behavior if at least one PoE device is selected. Otherwise, the schedule
can only be created or deleted.
The schedule created by this service uses a reserved name (orch_power_sched). Time ranges
with other names are ignored by SNA.
When applying the settings, the applied behavior is bound to all selected ports. All ports that
are not selected are unbound from the schedule if they were previously bound.
Non-PoE ports are only affected if one of the behaviors, which shut down data is selected. If a
selected port is not affected by the selected behavior, a note is added to the success message.
This note notifies the user that some ports were not bound because the selected behavior did
not apply to them.
Setting up a Power Management Policy
To set up a power management policy:
Select a device in the Topology view.
Select the Power Management service in the right-hand information.
Setting up a Power Management
25
Policy) and
527

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents