Chapter 8
Powering On and Verifying the Stack
This chapter contains the following procedures:
"Powering On the Switches Sequentially" on page 106
"Powering On the Switches Simultaneously" on page 108
"Verifying the Stack" on page 110
"Monitoring the Initialization Processes" on page 113
"Specifying Ports in the Command Line Interface for Stacks" on
page 116
Perform "Powering On the Switches Sequentially" on page 106 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform "Powering On the Switches Simultaneously" on
page 108 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the Software Reference for x550
Series Switches, AlliedWare Plus Operating System.
Caution
You should not change the ID numbers of the switches after
configuring the parameter settings. Otherwise, the stack might
assign configuration settings to the wrong units.  E79