Figure 4-12. Isbm And Upm Section Conduit And Wire Entry Locations - Eaton Power Xpert 9395 Installation And Operation Manual

Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW

Figure 4-12. ISBM and UPM Section Conduit and Wire Entry Locations

®
®
Eaton
Power Xpert
9395P-300 (300kVA, 300kW) UPS Installation and Operation Manual
Front
ISBM
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Front
ISBM
P-164000563—Rev 04 www.eaton.com/powerquality
Installation
Front
UPM
Front
UPM
4-15

Advertisement

Table of Contents
loading

Table of Contents