UPS System Installation
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Figure 4-4. Conduit and Wire Entry Locations
TM
4-8
Power Xpert
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
9395 550/275 UPS (225–550 kVA) Installation and Operation Manual 164201716—Rev 8 www.eaton.com/powerquality
Ventilation Grill Debris Shield
(Remove shield before operating
system.)
Front
Front
TOP VIEW
BOTTOM VIEW