Use the procedures in the following paragraphs to connect the TB1, TB1 Battery, TB2, and TB3 interface
connections.
4.9.1

TB1, TB2, and TB3 Connections (Other than TB1 Battery Interface Connections)

NOTE
When installing interface wiring for TB1, TB2, and TB3 connections, conduit must
be installed between each device and the UPS cabinet.
NOTE
Interface wiring must be installed from the top of the UPS cabinet.
To install wiring to connections:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 7, "UPS Operating
Instructions" for shutdown instructions.
2.
If not already opened, unfasten the front door latch and swing the door open (see Figure 4-1).
3.
If not already removed, remove the door. Remove the retaining screw located inside the door at the
bottom hinge pivot point, then lift the door off. Retain the hardware for later use.
4. Terminal block TB3 is accessible on the left side of the X-Slot communication bay. To gain access to
terminal block TB1, TB2, and the left interface entry conduit landing plates, remove the screws securing
the top internal safety shield panel and remove the panel. Retain the hardware for later use (see
Figure 4-18).
5.
Remove the interface entry conduit landing plates to drill or punch holes (see Figure 4-12).
6.
Reinstall the interface entry plates and install the conduit.
Do not directly connect relay contacts to the mains related circuits. Reinforced insulation to the
mains is required.
Ne pas directement brancher les contacts de relais aux circuits du réseau. Une isolation renforcée
des réseaux est nécessaire.
7 .
To locate the appropriate terminals and review the wiring and termination requirements, see paragraph
3.2.6, Table 4-1, and Figure 4-12 through Figure 4-17 for wiring access.
8.
Route and connect the wiring.
9.
If wiring TB1 battery interface connections, proceed to paragraph 4.9.2; if wiring the X-Slot connections
only, proceed to paragraph 4.9.3; otherwise, proceed to Step 10.
10. Reinstall the top internal safety shield panel and secure with the retained hardware.
11. Reinstall the front door removed in Step 3 and secure with the retained hardware.
12. Close the door and secure the latch.
®
®
Eaton
Power Xpert
9395P-300 (300kVA, 300kW) UPS Installation and Operation Manual
WARNING
AVERTISSEMENT!
P-164000563—Rev 04 www.eaton.com/powerquality
Installation
4-23

Advertisement

Table of Contents
loading

Table of Contents