Chapter 7
UPS Operating Instructions
This section describes how to operate the UPS.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control and monitor UPS
operation. Figure 7-1 Identifies the touchscreen control panel and the location of the CB1 circuit breaker
(optional).
Figure 7-1. 300 kW/kVA UPS Controls (380V, 400V, 415V, and 480V)
7.1.1
Control Panel
The control panel is used to set up and control the UPS, and to monitor UPS operation. For a description of the
UPS control panel functions, see paragraph 7.3.
®
®
Eaton
Power Xpert
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary
startup verifies all electrical interconnections to ensure the installation was
successful and the system operates properly
NOTE
Read this section of the manual and have thorough knowledge of UPS operation
before attempting to operate any of the controls.
NOTE
The UPS displays two minutes of battery runtime at the initial startup. After a
24-hour charging period, the UPS automatically runs a battery test and the correct
battery runtime displays
AC Input Breaker
CB1 (optional)
9395P-300 (300kVA, 300kW) UPS Installation and Operation Manual
P-164000563—Rev 04 www.eaton.com/powerquality
Color Touchscreen
Control Panel
7-1