20. If installing more than one IBC, repeat Steps through
4.4 Battery Breaker Instantaneous Trip
4.4 Battery Breaker Instantaneous Trip
NOTE
Internal battery strings are to be connected by an authorized Eaton Customer Service
Engineer at system startup.
Figure 20. IBC Bottom Entry Conduit and Wire Entry Locations
Eaton 93PM Universal Integrated Battery Cabinet (IBC-LW and IBC-LHW) Installation Manual P-164000541—Rev 04
Step 19
for each IBC, and then proceed to paragraph
Setting; otherwise, skip to paragraph
Setting.
Bottom Entry Conduit Landing
(Remove plate to drill or punch
conduit holes.)
Installation
45