Figure 4-12. Isbm Section Conduit And Wire Entry Locations - Eaton PowerXpert 9395P-600/600 Installation And Operation Manual

Powerxpert 9395 high performance (9395p-600) ups
Hide thumbs Also See for PowerXpert 9395P-600/600:
Table of Contents

Advertisement

UPS SYSTEM INSTALLATION
Front
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Front
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
4-16
Eaton Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Figure 4‐12. ISBM Section Conduit and Wire Entry Locations
TOP VIEW
BOTTOM VIEW
S
www.eaton.com/powerquality
P-164000710 Rev 1