UPS SYSTEM INSTALLATION
Front
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Front
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
4-16
Eaton Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Figure 4‐12. ISBM Section Conduit and Wire Entry Locations
TOP VIEW
BOTTOM VIEW
S
www.eaton.com/powerquality
P-164000710 Rev 1