UPS SYSTEM INSTALLATION
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
4-8
Eaton Power Xpert 9395P UPS (300 kVA, 300 kW) Installation and Operation Manual
Front
ISBM
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Front
ISBM
Figure 4‐5. ISBM and UPM Section Conduit and Wire Entry Locations
S
Front
UPM
Front
UPM
P-164000563 Rev 1 www.eaton.com/powerquality