Battery Power Wiring; Figure 17. Ups Conduit And Wire Entry Locations - Eaton 93PM Installation And Operation Manual

400v/480v four-wire 100 kw frame
Table of Contents

Advertisement

For a detailed view of the UPS terminal blocks, see
15. Proceed to Step 17.
16. Connect phase A, B, and C, and Neutral power wiring from output terminals to the critical load. See
paragraph
3.2.2 UPS System Power Wiring Preparation
For a detailed view of the UPS terminal blocks, see
As a result of the connected loads high leakage current is possible. Connection to earth ground is required for
safety and proper product operation. Do not check UPS operation by any action that includes removal of the
earth (ground) connection with loads attached.
17. Ground the UPS according to local and/or national electrical wiring codes by routing and connecting the
ground wire to the input ground lug. See
For a detailed view of the UPS ground terminals, see
18. Proceed to paragraph
4.6 Battery Power

Figure 17. UPS Conduit and Wire Entry Locations

Top View
Front
Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04
Figure
Figure
WARNING
Figure 20
for UPS terminal locations.
Figure
Wiring.
Front
Bottom View
Top Entry Conduit Landings for
Customer Interface Wiring
(Remove panels to drill or punch
conduit holes.)
UPS System Installation
21.
for wiring and termination requirements.
21.
21.
Bottom Entry Conduit Landings
for Customer Interface Wiring
(Remove panels to drill or punch
conduit holes.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)