Figure 73: Installing An Sfp Or Sfp+ Transceiver; Figure 74: Removing The Dust Cover From An Sfp Or Sfp+ Transceiver - Allied Telesis AT-x510-28GTX Installation Manual

X510 series gigabit ethernet switches
Hide thumbs Also See for AT-x510-28GTX:
Table of Contents

Advertisement

Figure 73. Installing an SFP or SFP+ Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat Step 1 through Step 4
to install the remaining SFP or SFP+ transceivers in the line cards.
5. Remove the dust cover from the transceiver, as shown in Figure 74.
Figure 74. Removing the Dust Cover from an SFP or SFP+ Transceiver
6. Verify the position of the handle on the SFP transceiver. If the
transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 75 on page 122. If the transceiver is in a bottom
slot, the handle should be in the down position.
x510 Series Installation Guide for Stand-alone Switches
121

Advertisement

Table of Contents
loading

Table of Contents