Multi-Chassis 4+2 Configuration; Prerequisites - Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Manual

Table of Contents

Advertisement

Cabling a Multi-Chassis Configuration
location F0/FC5
instance 2
location F0/FC6
instance 3
location F0/FC7
controller fabric plane 3
instance 0
location F1/FC4
instance 1
location F1/FC5
instance 2
location F1/FC6
instance 3
location F1/FC7
controller fabric plane 4
instance 0
location F0/FC8
instance 1
location F0/FC9
instance 2
location F0/FC10
instance 3
location F0/FC11
controller fabric plane 5
instance 0
location F1/FC8
instance 1
location F1/FC9
instance 2
location F1/FC10
instance 3
location F1/FC11

Multi-Chassis 4+2 Configuration

This section describes how to configure a multi-chassis 4+2 configuration. In this configuration, four line
card chassis (LCC0, LCC1, LCC2, and LCC3) are connected to two fabric card chassis (FCC0 and FCC1).

Prerequisites

For connecting the fabric, you need the following:
• 384 MPO-24 fiber cables (96 per LCC)
• Optical module sets:
◦ In 1T multi-chassis 4+2 mode: Eight CXP optical module sets (Cisco PID NCS-FAB-OPT). Two
sets are required per LCC: one set plugs into the LCC and the other set plugs into the FCC. Each
set includes 96 CXP-100G-SR12 modules for a total of 768 modules.
◦ In 2T multi-chassis 4+2 mode: Eight CXP2 optical module sets (Cisco PID NCS-FAB-OPT2).
Two sets are required per LCC: one set plugs into the LCC and the other set plugs into the FCC.
Each set includes 96 ONS-CXP2-SR25 modules for a total of 768 modules.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
Multi-Chassis 4+2 Configuration
173