Prerequisites; Required Tools And Equipment; Steps - Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Manual

Table of Contents

Advertisement

Installing the Power Enclosure, Power Trays, and Exterior Cosmetics

Prerequisites

Installing the Power Enclosure , on page 14

Required Tools and Equipment

• 8-inch, Number-1 Phillips screwdriver (magnetic head preferable)
• Two vertical cable troughs (left and right troughs are interchangeable)
• Three door hinges
• Three door latches
• Four trough retention brackets
• Front door
• Door grounding cable
• Craft panel cover
• Front top grille
• Front bottom grille
For information on the cosmetic PID numbers, see

Steps

To install the front exterior cosmetics, follow these steps:
Step 1
Remove the upper and lower horizontal cable management brackets (preinstalled on the FCC) by loosening and removing
the eight pan-head screws (four per bracket). One bracket is located above the upper card cage and the other bracket is
below the lower card cage.
Step 2
Attach the left and right vertical cable troughs to the front of the FCC. The two vertical cable troughs are installed inverted
from each other. Each trough is marked FRONT to ensure that you install the trough on the correct side of the FCC.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
Installing the Front Exterior Cosmetics
Cosmetic Product IDs, on page
134.
23

Advertisement

Table of Contents
loading

Table of Contents