Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Manual page 44

Table of Contents

Advertisement

Installing the Rear Exterior Cosmetics
3
Three door latches:
Door stop latch, top and bottom (700-39150-01)Door
latch, middle (700-46854-01)
For each vertical cable trough:
a) Align the guide pins on the rear of the vertical cable trough with the positioning holes on the rear of the chassis.
b) Loosely insert eight pan-head screws, and then use the screwdriver to tighten them clockwise to attach the vertical
cable troughs firmly to the front of the FCC. You might need to use a ladder to reach the upper screws .
c) Attach the trough retention brackets to each vertical trough with two 8-32 flat-head screws (two per trough).
d) Using the captive screw, insert the trough retention brackets into each upper and lower horizontal cable troughs on
the FCC (two screws per side).
Step 3
Reattach the upper and lower horizontal cable management brackets by inserting and tightening the eight pan-head
screws (four per bracket).
Step 4
Attach the side filler panels.
For each filler panel:
a) Align the guide pins on the filler panel with the positioning holes on top of the FCC.
b) Insert the filler panel into the FCC and slide it down until it is fully seated.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
30
Installing the Power Enclosure, Power Trays, and Exterior Cosmetics

Advertisement

Table of Contents
loading

Table of Contents