Removing An S2 Fabric Card; Guidelines For Handling Cxp2 Optical Modules - Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Manual

Table of Contents

Advertisement

Removing an S2 Fabric Card

Step 4
Press the OIR buttons on the top and bottom of the card faceplate to release the ejectors (SC-SW card only).
Step 5
Simultaneously pivot the ejector levers away from the faceplate to release the card from the midplane connectors.
Step 6
Grasp the two card ejector levers and simultaneously pivot both ejector levers 90 degrees away from the front edge of
the card carrier to unseat the card from the backplane connector.
Step 7
Grasp the ejector levers with both hands and gently pull the card halfway from the slot.
Step 8
Move one hand under the card to guide it. Avoid touching the card's printed circuit board, components, or any connector
pins.
Step 9
Touching only the metal card carrier, slide the card from the slot and place it directly into an antistatic sack or other
ESD-preventive container. If you plan to return a defective card to the factory, repackage it in the shipping container
that you received with the replacement card.
Removing an S2 Fabric Card
Unless otherwise noted, the information in this section applies to the NCS-F-FC and NCS-F-FC2 fabric
Note
cards.
This section describes how to remove an S2 fabric card from the Cisco NCS 6000 FCC.

Guidelines for Handling CXP2 Optical Modules

Hot surface. Statement 1079
Warning
The metal surfaces on the CXP2 can run hot. Use caution when removing CXP2 optical modules from the
second generation S2 Fabric Card (S2 FC2).
1
A thermoplastic sleeve is provided for each CXP2 port.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
120
Metal surfaces
Removing and Replacing Chassis Components

Advertisement

Table of Contents
loading

Table of Contents