Cabling a Multi-Chassis Configuration
Table 23: FCC0 SC-SW to SC-SW Card Connections (2+1 Configuration)
From SC-SW Card
SC0 EXP0
SC0 EXP1
SC1 EXP0
SC1 EXP1
SC0 HS0 (40GE)
SC0 HS1 (40GE)

Cabling the Control Plane for a 2+2 Multi-Chassis System

The following figure shows the control plane cabling for a 2+2 multi-chassis system.
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
Cabling the Control Plane for a 2+2 Multi-Chassis System
To SC-SW Card
SC0, any switch port
SC1, any switch port
SC0, any switch port
SC1, any switch port
SC1 HS0 (40GE)
SC1 HS1 (40GE)
147

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Network Convergence System 6000 Fabric Card Chassis and is the answer not in the manual?

Questions and answers

Table of Contents