HP 5890 SERIES II Service Manual page 95

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

37. Slide the heater and sensor cartridges into the heated block portion of the replacement detec-
tor weldment.
38. Position the replacement detector weldment in
the detector opening.
39. Install the insulation around the detector weld-
ment.
40. Position the insulation plate over the installed
insulation and align its mounting holes with
those of the detector weldment.
41. Secure the detector weldment and insulation
plate to the instrument with two screws.
42. Locate the " U- shaped"slots on the instrument
to the left of the inlet. Bend the tubes from the
new detector weldment to lay within these slots,
and any installed clips, and route them to the
flow manifold block on the left side of the instru-
ment.
CONNECTING THE HYDROGEN INLET TUBE
AT THE WRONG LOCATION ON THE FLOW
MANIFOLD
BLOCK
LEAKAGE,
CREATING
EXPLOSION HAZARD.
When installing tubing in the flow manifold
block, ensure that all o- rings are positioned
properly.
43. Connect the tubes from the new detector weld-
ment to the flow manifold block. (The hydrogen
tube is painted RED. Make sure each tube is
installed at the correct location on the flow
manifold block.)
44. If the PCOC fan and cover were removed, in-
stall them and secure using two screws.
45. Install the thermal strap and secure it to the in-
strument using five screws.
46. Install the base spanner nut on the detector
weldment and tighten using an open end
wrench.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
WILL
RESULT
IN
A
FIRE
AND
SVC 4- 25
SLOTS
TUBE OUTLET
FITTING PLATE
SCREW
FAN
SHROUD
COOLING
FLOW
FAN
DIRECTION
ARROW
FLOW
MANIFOLD

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents