HP 5890 SERIES II Service Manual page 115

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

38. Install the insulation around the detector weld-
ment.
39. Position the insulation plate over the installed
insulation and align its mounting holes with
those of the detector weldment.
40. Secure the detector weldment and insulation
plate to the instrument with two screws.
41. Locate the " U- shaped"slots on the instrument
to the left of the inlet. Bend the tubes from the
new detector weldment to lay within these slots,
and any installed clips, and route them to the
flow manifold block on the left side of the instru-
ment.
CONNECTING THE HYDROGEN INLET TUBE
AT THE WRONG LOCATION ON THE FLOW
MANIFOLD
BLOCK
LEAKAGE,
CREATING
EXPLOSION HAZARD.
When installing tubing in the flow manifold
block, ensure that all o- rings are positioned
properly.
42. Connect the tubes from the new detector weld-
ment to the flow manifold block. (The hydrogen
tube fitting is painted RED. Make sure each
tube is installed at the correct location on the
flow
manifold block.)
43. If the PCOC fan and cover were removed, in-
stall them and secure using two screws.
44. Install the thermal strap and secure it to the in-
strument using five screws.
COLLECTOR
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
WILL
RESULT
IN
A
FIRE
AND
DETECTOR COVER
INTERCONNECT
CLAMP SCREW
SVC 4- 45
SLOTS
TUBE OUTLET
FITTING PLATE
SCREW
FAN
SHROUD
COOLING
FAN
FLOW
MANIFOLD
FLOW
DIRECTION
ARROW

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents