HP 5890 SERIES II Service Manual page 102

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

32. Guide the new bead power cable through the slot on the edge of the electronics carrier and
down through the rectangular opening in the carrier top marked Detector A or B, depending on
which position is being used.
33. Orient the new plug in the same position as the one removed.
34. Install the interlocking side covers on the bead power and active element power control cables.
The following steps require protection against ESD (Electro- Static Discharge).
`
Use a grounded wrist strap (part no. 9300- 0969 - large, or 9300- 0970 - small)
connected to a suitable ground. Failure to heed this caution may result in
damage to the instrument.
When storing or in between handling of PCBs (Printed Circuit Boards), always
`
place them in static control envelopes or enclosures.
35. Install the NPD detector PCB by aligning the PCB with the guide slots. Press the board into its
connector on the circuit board.
NPD power control plugs installed in the wrong position will permanently damage the
NPD detector PCB.
36. Insert the bead power cable and active element power control cable plug into its connector re-
ceptacle on the NPD detector PCB.
37. Tighten the interconnect clamp screws on the thermal strap.
38. Install the right side panel and secure using four screws.
39. Install the electronics carrier top cover.
40. Restore all gas supplies.
41. Restore power to the instrument.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
TO NPD TRANSFORMER
TOP PART OF CONNECTOR
LOCKING TAB
5
1
LOCKING TAB
NOTE
5
ASSEMBLED
CONNECTORS
1
SVC 4- 32
TO NPD BEAD
POWER
CONTROL
BOTTOM PART OF
CONNECTOR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents