Chapter 3: Installing the Switch
Wall Studs
Wall
Plywood
Base
Tools and
Material
Installing the
Plywood Base
68
You should install the plywood base to the wall first and then install the
switch on the base. Refer to Figure 20.
Step 1: Install the
plywood base on
the wall.
Figure 20. Steps to Installing the Switch with a Plywood Base
Here are the tools and material required for installing the switch on a
wooden wall:
Two wall brackets (included with the switch)
Four bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Stud finder capable of identifying the middle of wall studs and hot
electrical wiring (not provided)
Plywood base (not provided)
Four wall screws for attaching the switch to the plywood base (not
provided). The diameter of the screw holes in the wall brackets is
4.5 mm (0.17 in.).
Four screws and anchors for attaching the plywood base to the
wall (not provided)
A plywood base is recommended when installing the switch on a wall that
has wooden studs. Consult a qualified building contractor for installation
instructions for the plywood base. The installation guidelines are listed
here:
You should use a stud finder to identify the middle of studs and hot
electrical wiring in the wall.
You should attach the base to two wall studs with a minimum of
four screws.
Step 2: Install the
switch on the
plywood base.