Allied Telesis AT-IE300-12GP Installation Manual page 9

Ie300 series. industrial ethernet switches
Hide thumbs Also See for AT-IE300-12GP:
Table of Contents

Advertisement

Figures
Figure 1: Front Panel of the AT-IE300-12GT Switch ............................................................................................................18
Figure 2: Front Panel of the AT-IE300-12GP Switch............................................................................................................19
Figure 3: Top Panel ..............................................................................................................................................................19
Figure 4: Back Panel Features .............................................................................................................................................20
Figure 5: Example 1 of the Alarm In (ALM IN) Connector ....................................................................................................37
Figure 6: Example 2 of the Alarm In (ALM IN) Connector ....................................................................................................38
Figure 7: Example of the Alarm Out Port..............................................................................................................................40
Figure 8: Twisted Pair Port LEDs on the AT-IE300-12GT Switch ........................................................................................42
Figure 9: Twisted Pair Ports on the AT-IE300-12GP Switch ................................................................................................43
Figure 10: Optional Drip Guard.............................................................................................................................................49
Figure 11: Pre-installed Components on the Front Panel.....................................................................................................59
Figure 12: Pre-installed Components on the Top Panel.......................................................................................................60
Figure 13: Pre-installed Component on the Back Panel.......................................................................................................61
Figure 14: Components in the Accessory Kit........................................................................................................................62
Figure 15: Orientation of the Switch on a DIN Rail ...............................................................................................................64
Figure 16: Installing the Switch on a DIN Rail - 1 .................................................................................................................65
Figure 17: Installing the Switch on a DIN Rail - 2 .................................................................................................................65
Figure 18: Verifying the DIN Rail Installation ........................................................................................................................66
Figure 19: Switch on the Wall with a Plywood Base.............................................................................................................67
Figure 20: Steps to Installing the Switch with a Plywood Base ............................................................................................68
Figure 21: Installing the Wall Brackets on the Switch...........................................................................................................69
Figure 22: Attaching the Switch to the Plywood Base ..........................................................................................................70
Figure 23: Marking the Locations of the Bracket Holes on a Concrete Wall ........................................................................72
Figure 24: Installing the Switch on a Concrete Wall .............................................................................................................73
Figure 25: Removing the Dust Plug from an SFP Slot .........................................................................................................79
Figure 26: Installing an SFP Transceiver..............................................................................................................................79
Figure 27: Removing the Dust Cover from an SFP Transceiver ..........................................................................................80
Figure 28: Verifying the Position of the SFP Handle ............................................................................................................80
Figure 29: Connecting a Fiber Optic Cable to an SFP Transceiver......................................................................................81
Figure 30: Stripping the Grounding Wire ..............................................................................................................................84
Figure 31: Loosening the Grounding Screw .........................................................................................................................85
Figure 32: Wrapping the Grounding Wire Around the Grounding Screw..............................................................................85
Figure 33: Securing the Grounding Wire to the Switch.........................................................................................................86
Figure 34: Polarity Legend for the Alarm Connectors...........................................................................................................88
Figure 35: Stripping an Alarm Wire.......................................................................................................................................88
Figure 36: Wrapping the Wire Strands .................................................................................................................................89
Figure 37: Removing an Alarm Connector ...........................................................................................................................89
Figure 38: Loosening the Wire Retaining Screws on an Alarm Connector...........................................................................89
Figure 39: Inserting the Wires into the DC Cable Connector................................................................................................90
Figure 40: Inserting the DC Connector into the Alarm Connector ........................................................................................91
Figure 41: Pin Signals Legends for the PWR 1 and PWR 2 Connectors .............................................................................92
Figure 42: Stripping a Power Cable Wire .............................................................................................................................93
Figure 43: Removing the PWR 1 - PWR 2 Cable Connector ...............................................................................................93
Figure 45: Inserting the Wires into the PWR 1 - PWR 2 Cable Connector...........................................................................94
Figure 46: Verifying the Wire Installation ..............................................................................................................................95
Figure 47: Connecting the Power Cable to the PWR 1 - PWR 2 Connector ........................................................................96
Figure 48: Initialization Messages ........................................................................................................................................98
Figure 49: Initialization Messages (Continued).....................................................................................................................99
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie300-12gt

Table of Contents