Monitoring The Initialization Process; Figure 48: Initialization Messages - Allied Telesis AT-IE300-12GP Installation Manual

Ie300 series. industrial ethernet switches
Hide thumbs Also See for AT-IE300-12GP:
Table of Contents

Advertisement

Chapter 5: Powering On the Switch

Monitoring the Initialization Process

Bootloader 3.1.7 loaded
Press <Crtl+B> for the Boot Menu
Reading filesystem...
Loading flash:IE300-5.4.6-20160329-2.rel
Verifying release... OK
Booting...
Starting base/first...
Mounting virtual filesystems...
Allied Telesis Inc.
AlliedWare Plus (TM) v5.4.6
Current release filename: IE300-5.4.6-20160329-2.rel
Built: Tue Mar 29 03:50:20 UTC 2016
Mounting static filesystems...
Checking flash filesystem...
Mounting flash filesystem...
Checking for last gasp debug output...
Starting base/dbus...
Starting base/syslog...
Starting base/loopback...
Starting base/poe_done...
Starting base/sysctl...
Received event poefw.done
Starting base/portmapper...
Received event syslog.done
Starting base/reboot-stability
Checking system reboot stability
Starting base/cron...
98
It takes one minute for the switch to initialize its operating system and load
the default configuration. You can monitor the bootup sequence by
connecting a terminal or computer with a terminal emulator program to the
Console port on the front panel. The parameter settings for the Console
port are found in "Starting a Local Management Session" on page 100.
Figure 48 here and Figure 49 on page 99 contain the initialization
messages.
After monitoring the initialization process, go to "Starting a Local
Management Session" on page 100.
Figure 48. Initialization Messages
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie300-12gt

Table of Contents