Verifying Switch Operations - Allied Telesis AT-IE300-12GP Installation Manual

Ie300 series. industrial ethernet switches
Hide thumbs Also See for AT-IE300-12GP:
Table of Contents

Advertisement

Verifying Switch
Operations
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
3. Connect the other end of the power cable to the DC power supply.
Refer to the documentation included with the unit for instructions.
4. Power on the DC power supplies.
Note
The switch does not have an On/Off switch.
5. Wait a minimum of one minute for the switch to initialize its operating
system.
To monitor the console messages as the device initializes the
management software, go to "Monitoring the Initialization Process" on
page 98.
Here are items to check to verify that the switch is operating normally. If
there is a problem, refer to Chapter 6, "Troubleshooting" on page 109 for
suggestions on how to resolve it.
The Fault LED should be off.
One or both PWR 1 and PWR 2 LEDs should be solid green,
depending on the number of DC power supplies connected to the
unit.
The LEDs on SFP slots with transceivers connected to active
network devices should be solid or flashing green.
The Link LEDs on twisted pair ports connected to active network
devices should be solid or flashing green or amber. The Link LEDs
are identified in Figure 8 on page 42 and Figure 9 on page 43.
The PoE LEDs on the AT-IE300-12GP Switch should be solid
green on ports that are connected to PoE, PoE+, or Hi-PoE
devices. The PoE LEDs are identified in Figure 9 on page 43.
After verifying the operations of the switch, go to "Starting a Local
Management Session" on page 100.
IE300 Series Installation Guide
97

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie300-12gt

Table of Contents