Powering On The Switch - Allied Telesis AT-IE300-12GP Installation Manual

Ie300 series. industrial ethernet switches
Hide thumbs Also See for AT-IE300-12GP:
Table of Contents

Advertisement

Chapter 5

Powering On the Switch

This chapter contains the following procedures:
"Connecting the Grounding Wire" on page 84
"Wiring the ALM IN and ALM OUT Connectors" on page 87
"Preparing the DC Power Cables" on page 92
"Powering On the Switch" on page 96
"Monitoring the Initialization Process" on page 98
"Starting a Local Management Session" on page 100
"Verifying the AT-IE300-12GP Switch" on page 102
"Installing the Optional Drip Guard" on page 107
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie300-12gt

Table of Contents