Chapter 5
Powering On the Switch
This chapter contains the following procedures:
"Connecting the Grounding Wire" on page 84
"Wiring the ALM IN and ALM OUT Connectors" on page 87
"Preparing the DC Power Cables" on page 92
"Powering On the Switch" on page 96
"Monitoring the Initialization Process" on page 98
"Starting a Local Management Session" on page 100
"Verifying the AT-IE300-12GP Switch" on page 102
"Installing the Optional Drip Guard" on page 107
83