Chapter 3: Installing the Switch
66
3. Visually inspect the bracket to verify that the DIN rail is now fitted into
the top and bottom slots. Refer to Figure 18.
Top slot
Bottom slot
Figure 18. Verifying the DIN Rail Installation
Note
Allied Telesis recommends installing DIN rail end clamps to the
sides of the switch to prevent damage or network traffic loss from
vibration or shock. End clamps are not available from Allied Telesis.
4. Go to Chapter 4, "Cabling the Ports" on page 75.