Chapter 5: Powering On the Switch
94
4. Loosen the wire retaining screws in the connector with a #1
screwdriver. Refer to Figure 44.
Figure 44. Loosening the Wire Retaining Screws on the PWR 1 - PWR 2
5. Insert the wires into the connector and tighten the retaining screws to
secure the wires. Refer to Figure 45.
Allied Telesis recommends tightening the screws to 2 to 3 in.-lbs.
Figure 45. Inserting the Wires into the PWR 1 - PWR 2 Cable Connector
6. After attaching the wires to the connector, verify that there are no
exposed wires or loose wire strands. Refer to Figure 46 on page 95.
Cable Connector
PWR 1
PWR 2
+
-
-
+