Bandai Namco Time Crisis 5 Operation Manual page 74

Table of Contents

Advertisement

8A. Service
- Must be performed by a technician -
Signboard (L) assembly
Connector
Monitor tower (L) assembly (inside)
74
24
Press the lower side of the signboard (C) assembly against the signboard (L) assembly by
using the upper side of the signboard (L) assembly as a fulcrum, and push the connector
into the signboard (L) assembly. Secure the signboard (C) assembly to the signboard (L) and (R)
assemblies using two Torx bolts (M5 x 12).
Take the connector, which has been inserted into the signboard (L) assembly in  , pull it
25
inside the monitor tower (L) assembly at the top, and then connect it.
[View from the bottom looking up at the top surface inside the monitor
tower (L) assembly]
Connector
26
Attach the maintenance doors and back panels to the monitor tower (L) and (R) assemblies
by reversing the procedures in steps  and  .
Monitor tower (L) assembly
Signboard (L) assembly
Signboard (C) assembly
Torx bolts (M5 x 12)
Signboard (R) assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents